{"id":3892,"date":"2025-11-20T00:08:06","date_gmt":"2025-11-19T23:08:06","guid":{"rendered":"https:\/\/gealegal.com\/?p=3892"},"modified":"2025-11-20T03:07:40","modified_gmt":"2025-11-20T02:07:40","slug":"proceso-arbitral-industria-petrolera","status":"publish","type":"post","link":"https:\/\/gealegal.com\/en\/proceso-arbitral-industria-petrolera\/","title":{"rendered":"Arbitration process in the oil industry"},"content":{"rendered":"<p class=\"translation-block\">GE&amp;A successfully represented an oilfield equipment maintenance company in a claim for breach of a major maintenance service contract for a crude oil storage tank and the installation of a floating membrane for a naphtha storage tank, which was handled through a complex arbitration process due to the abundance of technical and documentary evidence, as well as the examination and cross-examination of witnesses. The firm obtained an arbitration award favorable to the construction and maintenance company it represented.<\/p>\n\n\n\n<p><\/p>","protected":false},"excerpt":{"rendered":"<p>GE&amp;A represent\u00f3 con \u00e9xito a una empresa de mantenimiento de equipos de un campo petrolero en un reclamo por incumplimiento de un contrato de servicio de mantenimiento mayor de un tanque de almacenamiento de petr\u00f3leo crudo y la instalaci\u00f3n de la membrana flotante de un tanque de almacenamiento de nafta, tramitado a trav\u00e9s de un [&hellip;]<\/p>","protected":false},"author":1,"featured_media":3955,"comment_status":"closed","ping_status":"closed","sticky":false,"template":"","format":"standard","meta":{"footnotes":""},"categories":[11],"tags":[],"class_list":["post-3892","post","type-post","status-publish","format-standard","has-post-thumbnail","hentry","category-casos-de-exito"],"_links":{"self":[{"href":"https:\/\/gealegal.com\/en\/wp-json\/wp\/v2\/posts\/3892","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/gealegal.com\/en\/wp-json\/wp\/v2\/posts"}],"about":[{"href":"https:\/\/gealegal.com\/en\/wp-json\/wp\/v2\/types\/post"}],"author":[{"embeddable":true,"href":"https:\/\/gealegal.com\/en\/wp-json\/wp\/v2\/users\/1"}],"replies":[{"embeddable":true,"href":"https:\/\/gealegal.com\/en\/wp-json\/wp\/v2\/comments?post=3892"}],"version-history":[{"count":4,"href":"https:\/\/gealegal.com\/en\/wp-json\/wp\/v2\/posts\/3892\/revisions"}],"predecessor-version":[{"id":3958,"href":"https:\/\/gealegal.com\/en\/wp-json\/wp\/v2\/posts\/3892\/revisions\/3958"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/gealegal.com\/en\/wp-json\/wp\/v2\/media\/3955"}],"wp:attachment":[{"href":"https:\/\/gealegal.com\/en\/wp-json\/wp\/v2\/media?parent=3892"}],"wp:term":[{"taxonomy":"category","embeddable":true,"href":"https:\/\/gealegal.com\/en\/wp-json\/wp\/v2\/categories?post=3892"},{"taxonomy":"post_tag","embeddable":true,"href":"https:\/\/gealegal.com\/en\/wp-json\/wp\/v2\/tags?post=3892"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}